Sign In | Join Free | My adobecards.com
China Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd logo
Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Swiss Precision, German Quality, Chinese Intelligent Manufacturing
Verified Supplier

6 Years

Home > CVD Coating Machine >

Vertical Large Pyrolytic Carbon CVI Furnace Top/bottom Load with Max. Working Temperature of 1300C

Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Vertical Large Pyrolytic Carbon CVI Furnace Top/bottom Load with Max. Working Temperature of 1300C

Brand Name : Ruideer

Model Number : Customizable

Certification : CE

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : L/C, T/T

Supply Ability : 5-6 months/set

Delivery Time : 5-6 months

Packaging Details : wooden cases

Max.working temperature(℃) : 1300

Temperature uniformity(℃) : ≤±7

Ultimate vacuum(Pa) : 50

Pressure rise(Pa/h) rate : 3

Contact Now

Vertical large pyrolytic carbon CVI furnace top/bottom load

Chemical vapour infiltration (CVI) is a ceramic engineering process whereby matrix material is infiltrated into fibrous preforms by the use of reactive gases at elevated temperature to form fiber-reinforced composites.The earliest use of CVI was the infiltration of fibrous alumina with chromium carbide. CVI can be applied to the production of carbon-carbon composites and ceramic-matrix composites. A similar technique is chemical vapour deposition(CVD), the main difference being that the deposition of CVD is on hot bulk surfaces, while CVI deposition is on porous substrates.

This equipment used for densification of C/C and graphite materials through vapor infiltration.

Furnace Type Vertical type top/bottom load
Max. Working Temp 1300℃
Temperature Measurement Special design High temperature W-Re5/26 Thermocouple
Max Vacuum Degree 50Pa (under cold, empty, dry furnace)
Pressure rise rate 3Pa/h (Average value under cold, empty, dry furnace)
Functions

Automatic Positive Pressure, Negative Pressure Leak Detection

Ar Negative Pressure Dewaxing/H2 Micro Positive Pressure Dewaxing

Vacuum Sintering

Partial Pressure Sintering (Static, Dynamic)

Pressure Sintering

Rapid Cooling

Fully-automatic control & Safety interlock& Breakpoint continuing heating & Wireless remote control& Self-diagnosis

• Design standards

The equipment is designed in accordance with the pressure vessel requirements of the Quality and Technical Supervision Bureau, and is qualified after pressure testing and shipped. The electrical design and construction meet national standards.

• Installation pre-test and pre-acceptance

The equipment is fully assembled in our factory, including all pipelines, vacuum pipelines, process gas pipelines, cooling water pipelines, compressed air pipelines, etc. Pre-testing can be carried out after installation. At the customer site, pipelines other than the equipment are provided by the customer. The installation also includes the connection of all cables. At the customer site, the main cable connecting the power cabinet is provided by the customer. After installation, we conduct vacuum and positive pressure leakage tests on the entire equipment, as well as mechanical and electrical function tests.

• Disassembly and transportation

The equipment will be disassembled in several large parts, packed in a standardized manner, and loaded into the transport vehicle.

• Customer site installation and commissioning

The Redel after-sales engineer will lead the team to complete commissioning, product trial burning and other work within 20 working days. The customer needs to make appropriate preparations and provide the necessary tools, such as hoisting and lifting equipment. And provide installation personnel support (it is recommended to have 1 mechanical personnel and 1 electrical personnel).

• Final acceptance

After installation and commissioning, the equipment can be finally accepted in accordance with the requirements of the technical contract.

• Training

Our after-sales engineers will provide a systematic and complete on-site training, including operation, maintenance, troubleshooting, etc.

• Technical data delivery

To ensure safe operation and equipment maintenance, the following technical data will be provided to customers:

1. Equipment installation layout

2. User manual

3. Spare parts list

4. Electrical drawings

5.  Component manual

FAQ

Are you a factory or trading company?

Q: Are you a factory or trading company?

A:We are China leading high-temperature vacuum furnace manufacturer with over 10 years’ experience.

Do you have customization or OEM service?

Q: Do you have customization or OEM service??

A:Yes,we have powerful R&D team and high-tech equipment.So we can not only supply the regular model,but also the customizable furnace as the repuirment of our clients.

What's your advantage?

Q:What's your advantage?

A:

l Quick response to your enquiry

l High quality control

l Stable supply chain

l Timely delivery

l Excellent after-sales service


Product Tags:

Bottom load pyrolytic carbon CVI furnace

      

Vertical pyrolytic carbon CVI furnace

      

Top load pyrolytic carbon CVI furnace

      
 Vertical Large Pyrolytic Carbon CVI Furnace Top/bottom Load with Max. Working Temperature of 1300C Manufactures

Vertical Large Pyrolytic Carbon CVI Furnace Top/bottom Load with Max. Working Temperature of 1300C Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)